| Original Feasibility Study |
|
|
|
The WOW Board commissioned a Feasibility Study for the trail in 2003. The study reviewed the entire proposed 9 miles of trail through Laconia and estimated the cost at 3 million dollars. Read the original feasibility study by using this link. (1.7 mb file)
|



